NCI does a few shop fit outs for L’Oreal, which include updating the dust panels and inserting the new banners into the illuminated sections of the stands. These types of jobs are generally done before shop hours and required the fittings to be de-stocked before we can move them to the correct positions and the new dust panels and banners to be installed. The installer would than make sure the signage lighting is working.